©ISO ISO 2859-1:1999(E) iii 4-C Multiple sampling plans for reduced inspection (Master table).32. Sampling procedures for inspection. This standard is identical with ISO 2859-0 Sampling procedures for inspection by attributes Part 0: Introduction to the ISO 2859 attribute sampling system. BS 6001 Sampling procedures for inspection by attributes ISO 2859-1:1989 Part 1.
- Available Formats
- Options
- Availability
- Priced From ( in USD )
- 👥
- Immediate download
- $232.00
- Printed Edition
- Ships in 1-2 business days
- $267.00
- Printed Edition + PDF
- Immediate download
- $388.00
Customers Who Bought This Also Bought
ISO 11453:1996
Priced From $209.00ISO 7870-3:2012
Priced From $138.00ISO 11648-2:2001
Priced From $232.00ISO 14644-5:2004
Priced From $185.00
About This Item
Full Description
This part of ISO 2859 specifies an acceptance sampling system for inspection by attributes. It is indexed in terms of the acceptance quality limit (AQL).
Its purpose is to induce a supplier through the economic and psychological pressure of lot non-acceptance to maintain a process average at least as good as the specified acceptance quality limit, while at the same time providing an upper limit for the risk to the consumer of accepting the occasional poor lot.
Uni Iso 2859
Sampling schemes designated in this part of ISO 2859 are applicable, but not limited, to inspection of
- end items,
- components and raw materials,
- operations,
- materials in process,
- supplies in storage,
- maintenance operations,
- data or records, and
- administrative procedures.
Iso 2859 1 1999 Pdf Free
These schemes are intended primarily to be used for a continuing series of lots, that is, a series long enough to allow the switching rules (9.3) to be applied. These rules provide:
- a protection to the consumer (by means of a switch to tightened inspection or discontinuation of sampling inspection) should a deterioration in quality be detected;
- an incentive (at the discretion of the responsible authority) to reduce inspection costs (by means of a switch to reduced inspection) should consistently good quality be achieved.
Sampling plans in this part of ISO 2859 may also be used for the inspection of lots in isolation but, in this case the user is strongly advised to consult the operating characteristic curves to find a plan that will yield the desired protection (see 12.6). In that case, the user is also referred to the sampling plans indexed by limiting quality (LQ) given in ISO 2859-2.
Amendments, rulings, supplements, and errata
Browse related products from International Organization for Standardization
- International Organization for Standardization >By ICS Code >03: Sociology. Services. Company organization and management. Administration. Transport >03.120: Quality >03.120.30: Application of statistical methods
- International Organization for Standardization >By Technical Committee >TC 69: Applications of statistical methods >TC 69/SC 5: Acceptance sampling >TC 69/SC 5/WG 2: Sampling procedures for inspection by attributes (Revision of ISO 2859)